Water Supply Scheme Of Tangalle Project

Rehabilitation and Augmentation of Tangalle water Supply Scheme
Scope Scope Scope

This TCCF (Tier Certified Constructed Facility) certified Tier-3 Data Centre included Design, Implementation, Testing, Commissioning and Handover of Internet Data Centre (IDC) including Maintenance. The scope included supply and installation of

  • Structure cabling including all the accessories
  • UPS and Battery Bank including all the accessories
  • LV Panel including all the accessories
  • HVAC panel
  • MV Panel including all the accessories
  • HVAC Engineering materials including all the accessories
  • PA, WLD, 2 way communication and RRS including all the accessories
  • CCTV including all the accessories
  • Access control including all the accessories
  • Fire suppression system including all the accessories
  • Chiller installation including supply all the accessories
  • Installation of Diesel Generator including all the accessories
  • Installation of Transformer including all the accessories

 

  • Clien: National Water Supply & Drainage Board
  • Completion Year: 2008
  • Location: Tangalle, Sri Lanka